Tuesday, January 14, 2014

Dreamliner problems.....They never end.


The solution of taking the raging inferno batteries and shoving them in a steel fire box with an exhaust pipe didn’t make the problem disappear…..Wow who could have seen that coming.  I thought for sure the cross your fingers engineering method was going to be the end of the problem.

I hope Boeing doesn’t spend too much time on the burning batteries because the wings are also falling apart after just18 months of use. 

And we are not done yet…..Also the windshields are cracking.


“These signs of "premature aging" have now led airlines using the Dreamliner, like AI, if Boeing has had serious quality issues with the plane. "The plane was delayed by years and Boeing was required to pay penalty to airlines for that. They have hurried up and outsourced a lot of jobs to China for cost control. The effect on quality is showing," said a pilot. “

Aviation minister Ajit Singh had last month said that AI's Dreamliner fleet had suffered 136 'minor' technical problems between their delivery since September, 2012, and November, 2013. 

136 problems in 14 months is called a lemon.


Embarrassing……

Ah Outsourcing.  It is just terrific.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home